• To be an technological innovative excellent enterprise in the fields of energy clean utilization and energy-saving & environment protection. 
    Innovate green energy engineering ,Improve the quality of human life
    Hainan Liaoning Beijing Inner Mongolia Heilongjiang Jilin Hebei Shandong Shanxi Shaanxi Henan Xinjiang Jiangsu Anhui Hubei Zhejiang Jiangxi Hunan Fujian Guangdong Guangxi Yunnan Sichuan
    Hainan
    Chengmai
    City:Chengmai
    CNPC Hainan LNG Depot Project

    It is the first small LNG receiving terminal in China that adopts the proprietary technologies and domestic equipment. The annual turnover of the project is 3 million m3 (about 1.32 million ton) . The total capacity of the LNG storage tanks is 200,000 m3 This project is located in Chengmai County, Hainan Province. Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning and start-up. The project has been put into operation in 2014. The LNG receiving terminal system recovers BOG gas through ambient temperature compressors, which reduces cost and the equipment procurement period. It fills the gap of applying ambient temperature compressor in the LNG receiving terminal at home and abroad, and has obtained two national patent certificates.
    Liaoning
    Huludao
    City:Huludao
    Huludao Qinshen Line Natural Gas Pipeline Utilization Project
     
    Pipe diameter: DN600 Length: 14.7km Design pressure: 4.4MPa Huludao Project Department Tel: +86-429-3122674
    Beijing
    Beijing
    City:Beijing
    Beijing Yanhua 3rd Power Plant 220 t/h CWS Boiler Exhaust Denitration Project

    Inner Mongolia
    Dalad Banner Wuhai Ulanchab
    City:Dalad Banner
    Microalgae Carbon Fixation Bio-Energy Industrialization Demonstration Project
    City:Wuhai
    Wuhai Huaxin COG to LNG Project
     
    Project Capacity: 240 Million Nm3/a Contracting type: EPC
    City:Ulanchab
    Wulanchabu Underground Coal Gasification 20kt/Year Methanol Pilot Project  
     
    Heilongjiang
    Hegang
    City:Hegang
    Hegang Zhengnan COG to LNG Project
      
    Project Capacity: 264 Million Nm3/a Contracting type: E
    Jilin
    Hebei
    Bazhou Xingtai Cangzhou Tangshan Qinhuangdao Baoding Langfang
    City:Bazhou
    South-to-North Water Diversion Bazhou Auxiliary Project - Hebei Shengfang Water Treatment Plant and Water Distribution Pipeline Project

    Water treatment capacity is 80,000m3/d and in the long term plan it is 100,000m3/d. The area for the production and office use in the plant is 12,500m2. There are 30 water tanks of various volumes and the water storage capacity is 28,000m3
    The water from the South-to-North water diversion project has met the drinking water standards via dosing in front of filtering, mechanical mixing, mesh flocculation, inclind pipe deposite, V type filter cistern, dosing after filtering, etc. When the project is completed, it will effectively improve the quality of drinking water and local people can drink the clean, hygiene and safe Yangtze River water.
    CNPC Hebei Huaqi - Bazhou Kangxianzhuang LNG Project
    Treatment capacity: 1 Million Nm3/d Located at Kangxianzhuang, Bazhou City, the project consists a 20,000 Nm3 LNG storage tank, a filling station with 6 loading arms, associated utilities, substation and power distribution station. By using a leading MRC and liquefaction technology, it greatly reduces the customer’s operation and maintenance cost. The project was successfully put into production in March 2013.
    City:Xingtai
    Jiantao (Hebei) Chemical Co., Ltd. 100,000Nm3/h Coke Oven Flue Gas Comprehensive Utilization Project (First Phase)
    City:Cangzhou
    Huabei Oilfield Renqiu LNG Project 

    Treatment capacity:100,000 Nm3/d
    City:Tangshan
    Thangshan Tangsteel COG to LNG Project

    Annual COG treatment capacity: 320 Million Nm3 Annual LNG capacity: 173,600,000Nm3 High purity hydrogen extraction: 16 Million Nm3/a
    The project is located at Luanxian County Industrial Zone, Hebei Province. It uses advanced technologies independently developed by Xindi, such as COG purification, methanation, MRC liquefaction, low temperature fractionation, and carbon addition to improve methane production and PSA to extract hydrogen.
    The project was successfully put into operation in August 2014.

    City:Qinhuangdao
    Qinhuangdao Anfeng Steel Co., Ltd. COG to LNG Project
     
    Treatment capacity: 880 Million Nm3/a Contracting type: E
    City:Baoding
    Bazhou-Baoding Natural Gas Pipeline project
     
    Pipe Diameter: D300 Length: 94.9km Design Pressure: 6.3MPa
    City:Langfang
    Langfang project department telephone: +86-316-2691275
    Shandong
    Liaocheng Huangdao Jiaozhou Rizhao Chengyang Zhucheng Zaozhuang Anqiu
    City:Liaocheng
    Liaocheng project department telephone: +86-635-6961989
    City:Huangdao
    Huangdao project department telephone: +86-532-86888186 Huangdao (Jiaonan) project department telephone: +86-532-89053351
    City:Jiaozhou
    Jiaozhou project department telephone: +86-532-82212960
    City:Rizhao
    Rizhao project department telephone: +86-633-3388028
    City:Chengyang
    Chengyang project department telephone: +86-532-87966290
    City:Zhucheng
    Zhucheng project department telephone: +86-536-6539998
    City:Zaozhuang
    Field: COG to LNG Project Project Name: Shandong Weijiao COG to LNG Project Capacity: 560 Million Nm3/a Contracting type: E

    City:Anqiu
    Anqiu-Zhucheng Natural Gas Long Distance Pipeline EPC Project
     
    Pipe Diameter: D457 Length: 60km Design Pressure: 4.0MPa
    Shanxi
    Jincheng Lvliang Taiyuan
    City:Jincheng
    2nd Phase of Shanxi Qinshui ENN Coal Bed Methane Liquefaction Project  

    Treatment capacity: 300,000 Nm3/d 

    Shanxi Yangcheng Shuntianda CBM Liquefaction Plant
    Treatment capacity: 300,000 Nm3/d

    City:Lvliang
    Shanxi Gas Linxian CBM Liquefaction Project
    Treatment capacity: 1,200,000 Nm3/d
    City:Taiyuan
    Shanxi Longhui COG to LNG Project
     
    Project Capacity: 184 Million Nm3/a Contracting type: EPC
    Shanxi Huayang COG to LNG Project
     
    Project Capacity: 270 Million Nm3/a Contracting type: EPC
    Shaanxi
    Weinan
    City:Weinan
    Shaanxi Beiqiang COG to LNG Project
     
    Project Capacity: 360 Million Nm3/a Contracting type: EPC
    Henan
    Pingdingshan Luoyang Kaifeng Shangqiu Xinxiang
    City:Pingdingshan
    Henan Jingbao COG to LNG Project

    Annual COG treatment capacity: 240 Million Nm3 Annual LNG capacity: 95 Million Nm3
    The project is located at Pingdingshan City, Henan Province. Xindi provides complete process package, design and installation service, as well as the independently developed technologies such as COG purification, methanation, liquefaction and separation process. LNG production by using the COG produced during the coking production process not only improves the comprehensive utilization of COG, but also effectively reduces the customer’s investment and operating cost.
    The project was successfully put into production in May 2013 at one go and has been working smoothly since then. It has achieved the design LNG capacity of 300,000m3/day and has become the model project for its long term, full load and safe operation.
    City:Luoyang
    Xin’an Yushan Coal Mine Coal Well-type Gasification Coal Mining Pilot Project
     
    City:Kaifeng
    Kaifeng project department telephone: +86-371-22992161
    City:Shangqiu
    Shangqiu project department telephone: +86-370-6086809
    City:Xinxiang
    Xinxiang project department telephone: +86-373-3069237
    Xinjiang
    Jiangsu
    Nanjing Nantong Huaian Lianyungang Yancheng Taixing Yangzhou
    City:Nanjing
    Nanjing Industrial Park Supercritical Oxidation Industrial Solid Waste Treatment Project
    City:Nantong
    Nantong Zhengtuo Gas Co., Ltd. 6,500Nm³/h Industrial Waste Gas Regeneration Comprehensive Utilization Project
    City:Huaian
    Huaian project department telephone: +86-517-83991693
    City:Lianyungang
    Lianyungang project department telephone: +86-518-85154162
    City:Yancheng
    West to East Gas Pipeline “Baoying-Dafeng Port”Natural Gas Branch Pipeline (Terminal: Yancheng)
     
    Pipe Diameter: DN300 Length: 135km Design Pressure: 6.3MPa
    Yancheng project department telephone: +86-518-85154162
    City:Taixing
    Taixing project department telephone: +86-523-87665750
    City:Yangzhou
    West to East Gas Pipeline “Baoying-Dafeng Port”Natural Gas Branch Pipeline (Start from Yangzhou) 
     
    Pipe Diameter: DN300 Length: 135km Design Pressure: 6.3MPa
    Anhui
    Bengbu Chaohu Lu’an Chuzhou Bozhou Dingyuan
    City:Bengbu
    Bengbu project department telephone: +86-552-4045702
    City:Chaohu
    Chaohu project department telephone: +86-551-82856759
    City:Lu’an
    Lu’an project department telephone: +86-564-3365750
    City:Chuzhou
    Chuzhou project department telephone: +86-550-3078276
    City:Bozhou
    Bozhou project department telephone: +86-558-5533395
    City:Dingyuan
    Dingyuan-Fengyang High Pressure Gas Pipeline Project
     
    Pipe Diameter: D508 Length: 186km Design Pressure: 6.0MPa
    Hubei
    Zhejiang
    Zhoushan Jiaxing
    City:Zhoushan
    Zhejiang Zhoushan LNG receiving terminal and filling station project

    The annual designed LNG turnover for the first phase is 3 million tons, and the total annual turnover will be 10 million tons. It can realize the entire LNG process operation such as LNG receiving, storage, gasification, ship loading, truck loading,etc. Three jetties for unloading, loading and roll-on roll-off vessel can perform loading/unloading simultaneously.  The integrated cold energy utilization technology combining with power generation, ice-making and air conditioning from cold energy.  The main vaporizer and sea water circulating pump are all domestic equipment, which has improved the localization rate of main equipment.   Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning and start-up. The project aims at a LNG filling base for international vessels combining with the clean energy demand for the sustainable development in Zhoushan Islands and new district in future, also, it can work as a natural gas reserve for the emergency and peak-shaving in Zhejiang Province. It will become one of the receiving terminals with the largest capacity and most complete functions in China.  It is expected in operation in 2018.
    City:Jiaxing
    Haining Nanbei Avenue/Jianshan New District Sub-High Pressure Natural Gas Pipeline 
     
    Pipe Diameter: DN350 Length: 25Km Design Pressure: 0.8MPa
    Jiangxi
    Hunan
    Zhuzhou Xiangtan Huaihua Changsha
    City:Zhuzhou
    Zhuzhou project department telephone: +86-731-28835328
    City:Xiangtan
    Xiangtan project department telephone:+86-731-52255151
    City:Huaihua
    Huaihua project department telephone: +86-745-2655253
    City:Changsha
    Xingsha Storage & Distribution General Contracting Project for Hunan ENN Changsha Natural Gas Utilization Engineering 

    Treatment capacity:200,000 Nm3/d 
    Fujian
    Quanzhou Hui’an Nan’an
    City:Quanzhou
    Quanzhou project department telephone: +86-595-22003085
    City:Hui’an
    Hui’an project department telephone: +86-595-87800330
    City:Nan’an
    Nan’an project department telephone: +86-595-86921157
    Guangdong
    Maoming Dongguan Zhaoqing Huadu
    City:Maoming
    Sinopec Maoming Branch High Sulfur Coking Coal CFB Boiler Attaching with FGD Unit Project 
    City:Dongguan
    Dongguan High Pressure Pipeline
     
    Pipe Diameter: DN610 Length: 210Km Design Pressure: 4.4MPa
    City:Zhaoqing
    Zhaoqing project department telephone: +86-758-2799860
    City:Huadu
    Huadu project department telephone: +86-20-29892772
    Guangxi
    Guilin Beibuwan
    City:Guilin
    Guilin project department telephone: +86-773-3559369
    City:Beibuwan
    Beihai ENN Weizhou Island LNG Project

    Treatment capacity: 250,000 Nm3/d 
    Yunnan
    Qujing
    City:Qujing
    Qujing Yuntou COG to LNG Project
     
    Project Capacity: 184 Million Nm3/a Contracting type: EPC
    Sichuan
    About Us
    Profile Culture Organization Responsibility
    Technology Innovation
    Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
    Capacity & References
    Qualifications Capacity Typical Cases Project List
    Contact Us
    Xindi Energy Engineering Technology Co., Ltd.
    Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
    Fax:+86-316-2591234
    Xindi Energy Engineering