• To be an technological innovative excellent enterprise in the fields of energy clean utilization and energy-saving & environment protection. 

    Innovate green energy engineering ,Improve the quality of human life

    Hainan Liaoning Beijing Inner Mongolia Heilongjiang Jilin Hebei Shandong Shanxi Shaanxi Henan Xinjiang Jiangsu Anhui Hubei Zhejiang Jiangxi Hunan Fujian Guangdong Guangxi Yunnan Sichuan
    Hainan
    Chengmai
    City:Chengmai

    CNPC Hainan LNG Depot Project

    It is the first small LNG receiving terminal in China that adopts the proprietary technologies and domestic equipment.

    The annual turnover of the project is 3 million m3 (about 1.32 million ton) .

    The total capacity of the LNG storage tanks is 200,000 m3

    This project is located in Chengmai County, Hainan Province. Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning and start-up. The project has been put into operation in 2014. The LNG receiving terminal system recovers BOG gas through ambient temperature compressors, which reduces cost and the equipment procurement period. It fills the gap of applying ambient temperature compressor in the LNG receiving terminal at home and abroad, and has obtained two national patent certificates.


    Liaoning
    Huludao
    City:Huludao

    Huludao Qinshen Line Natural Gas Pipeline Utilization Project
     

    Pipe diameter: DN600

    Length: 14.7km

    Design pressure: 4.4MPa

    Huludao Project Department Tel: +86-429-3122674

    Beijing
    Beijing
    City:Beijing

    Beijing Yanhua 3rd Power Plant 220 t/h CWS Boiler Exhaust Denitration Project


    Inner Mongolia
    Dalad Banner Wuhai Ulanchab
    City:Dalad Banner

    Microalgae Carbon Fixation Bio-Energy Industrialization Demonstration Project

    City:Wuhai

    Wuhai Huaxin COG to LNG Project
     

    Project Capacity: 240 Million Nm3/a

    Contracting type: EPC


    City:Ulanchab

    Wulanchabu Underground Coal Gasification 20kt/Year Methanol Pilot Project  
     

    Heilongjiang
    Hegang
    City:Hegang

    Hegang Zhengnan COG to LNG Project
      

    Project Capacity: 264 Million Nm3/a

    Contracting type: E


    Jilin
    Hebei
    Bazhou Xingtai Cangzhou Tangshan Qinhuangdao Baoding Langfang
    City:Bazhou

    South-to-North Water Diversion Bazhou Auxiliary Project - Hebei Shengfang Water Treatment Plant and Water Distribution Pipeline Project

    Water treatment capacity is 80,000m3/d and in the long term plan it is 100,000m3/d. The area for the production and office use in the plant is 12,500m2. There are 30 water tanks of various volumes and the water storage capacity is 28,000m3

    The water from the South-to-North water diversion project has met the drinking water standards via dosing in front of filtering, mechanical mixing, mesh flocculation, inclind pipe deposite, V type filter cistern, dosing after filtering, etc. When the project is completed, it will effectively improve the quality of drinking water and local people can drink the clean, hygiene and safe Yangtze River water.


    CNPC Hebei Huaqi - Bazhou Kangxianzhuang LNG Project


    Treatment capacity: 1 Million Nm3/d

    Located at Kangxianzhuang, Bazhou City, the project consists a 20,000 Nm3 LNG storage tank, a filling station with 6 loading arms, associated utilities, substation and power distribution station. By using a leading MRC and liquefaction technology, it greatly reduces the customer’s operation and maintenance cost.

    The project was successfully put into production in March 2013.


    City:Xingtai

    Jiantao (Hebei) Chemical Co., Ltd. 100,000Nm3/h Coke Oven Flue Gas Comprehensive Utilization Project (First Phase)

    City:Cangzhou

    Huabei Oilfield Renqiu LNG Project 

    Treatment capacity:100,000 Nm3/d


    City:Tangshan

    Thangshan Tangsteel COG to LNG Project

    Annual COG treatment capacity: 320 Million Nm3

    Annual LNG capacity: 173,600,000Nm3

    High purity hydrogen extraction: 16 Million Nm3/a


    The project is located at Luanxian County Industrial Zone, Hebei Province. It uses advanced technologies independently developed by Xindi, such as COG purification, methanation, MRC liquefaction, low temperature fractionation, and carbon addition to improve methane production and PSA to extract hydrogen.


    The project was successfully put into operation in August 2014.



    City:Qinhuangdao

    Qinhuangdao Anfeng Steel Co., Ltd. COG to LNG Project
     

    Treatment capacity: 880 Million Nm3/a

    Contracting type: E


    City:Baoding

    Bazhou-Baoding Natural Gas Pipeline project
     

    Pipe Diameter: D300

    Length: 94.9km

    Design Pressure: 6.3MPa


    City:Langfang

    Langfang project department telephone: +86-316-2691275

    Shandong
    Liaocheng Huangdao Jiaozhou Rizhao Chengyang Zhucheng Zaozhuang Anqiu
    City:Liaocheng

    Liaocheng project department telephone: +86-635-6961989

    City:Huangdao

    Huangdao project department telephone: +86-532-86888186

    Huangdao (Jiaonan) project department telephone: +86-532-89053351

    City:Jiaozhou

    Jiaozhou project department telephone: +86-532-82212960

    City:Rizhao

    Rizhao project department telephone: +86-633-3388028

    City:Chengyang

    Chengyang project department telephone: +86-532-87966290

    City:Zhucheng

    Zhucheng project department telephone: +86-536-6539998

    City:Zaozhuang

    Field: COG to LNG Project

    Project Name: Shandong Weijiao COG to LNG Project

    Capacity: 560 Million Nm3/a

    Contracting type: E



    City:Anqiu

    Anqiu-Zhucheng Natural Gas Long Distance Pipeline EPC Project
     

    Pipe Diameter: D457

    Length: 60km

    Design Pressure: 4.0MPa


    Shanxi
    Jincheng Lvliang Taiyuan
    City:Jincheng

    2nd Phase of Shanxi Qinshui ENN Coal Bed Methane Liquefaction Project  

    Treatment capacity: 300,000 Nm3/d 

    Shanxi Yangcheng Shuntianda CBM Liquefaction Plant


    Treatment capacity: 300,000 Nm3/d



    City:Lvliang

    Shanxi Gas Linxian CBM Liquefaction Project


    Treatment capacity: 1,200,000 Nm3/d


    City:Taiyuan

    Shanxi Longhui COG to LNG Project
     

    Project Capacity: 184 Million Nm3/a

    Contracting type: EPC


    Shanxi Huayang COG to LNG Project
     

    Project Capacity: 270 Million Nm3/a

    Contracting type: EPC


    Shaanxi
    Weinan
    City:Weinan

    Shaanxi Beiqiang COG to LNG Project
     

    Project Capacity: 360 Million Nm3/a

    Contracting type: EPC


    Henan
    Pingdingshan Luoyang Kaifeng Shangqiu Xinxiang
    City:Pingdingshan

    Henan Jingbao COG to LNG Project

    Annual COG treatment capacity: 240 Million Nm3

    Annual LNG capacity: 95 Million Nm3


    The project is located at Pingdingshan City, Henan Province. Xindi provides complete process package, design and installation service, as well as the independently developed technologies such as COG purification, methanation, liquefaction and separation process. LNG production by using the COG produced during the coking production process not only improves the comprehensive utilization of COG, but also effectively reduces the customer’s investment and operating cost.


    The project was successfully put into production in May 2013 at one go and has been working smoothly since then. It has achieved the design LNG capacity of 300,000m3/day and has become the model project for its long term, full load and safe operation.


    City:Luoyang

    Xin’an Yushan Coal Mine Coal Well-type Gasification Coal Mining Pilot Project
     

    City:Kaifeng

    Kaifeng project department telephone: +86-371-22992161

    City:Shangqiu

    Shangqiu project department telephone: +86-370-6086809

    City:Xinxiang

    Xinxiang project department telephone: +86-373-3069237

    Xinjiang
    Jiangsu
    Nanjing Nantong Huaian Lianyungang Yancheng Taixing Yangzhou
    City:Nanjing

    Nanjing Industrial Park Supercritical Oxidation Industrial Solid Waste Treatment Project

    City:Nantong

    Nantong Zhengtuo Gas Co., Ltd. 6,500Nm³/h Industrial Waste Gas Regeneration Comprehensive Utilization Project

    City:Huaian

    Huaian project department telephone: +86-517-83991693

    City:Lianyungang

    Lianyungang project department telephone: +86-518-85154162

    City:Yancheng

    West to East Gas Pipeline “Baoying-Dafeng Port”Natural Gas Branch Pipeline (Terminal: Yancheng)
     

    Pipe Diameter: DN300

    Length: 135km

    Design Pressure: 6.3MPa


    Yancheng project department telephone: +86-518-85154162

    City:Taixing

    Taixing project department telephone: +86-523-87665750

    City:Yangzhou

    West to East Gas Pipeline “Baoying-Dafeng Port”Natural Gas Branch Pipeline (Start from Yangzhou) 
     

    Pipe Diameter: DN300

    Length: 135km

    Design Pressure: 6.3MPa


    Anhui
    Bengbu Chaohu Lu’an Chuzhou Bozhou Dingyuan
    City:Bengbu

    Bengbu project department telephone: +86-552-4045702

    City:Chaohu

    Chaohu project department telephone: +86-551-82856759

    City:Lu’an

    Lu’an project department telephone: +86-564-3365750

    City:Chuzhou

    Chuzhou project department telephone: +86-550-3078276

    City:Bozhou

    Bozhou project department telephone: +86-558-5533395

    City:Dingyuan

    Dingyuan-Fengyang High Pressure Gas Pipeline Project
     

    Pipe Diameter: D508

    Length: 186km

    Design Pressure: 6.0MPa


    Hubei
    Zhejiang
    Zhoushan Jiaxing
    City:Zhoushan

    Zhejiang Zhoushan LNG receiving terminal and filling station project

    The annual designed LNG turnover for the first phase is 3 million tons, and the total annual turnover will be 10 million tons.

    It can realize the entire LNG process operation such as LNG receiving, storage, gasification, ship loading, truck loading,etc.

    Three jetties for unloading, loading and roll-on roll-off vessel can perform loading/unloading simultaneously. 

    The integrated cold energy utilization technology combining with power generation, ice-making and air conditioning from cold energy. 

    The main vaporizer and sea water circulating pump are all domestic equipment, which has improved the localization rate of main equipment.  

    Xindi independently accomplished the whole process of engineering design, procurement, construction, commissioning and start-up. The project aims at a LNG filling base for international vessels combining with the clean energy demand for the sustainable development in Zhoushan Islands and new district in future, also, it can work as a natural gas reserve for the emergency and peak-shaving in Zhejiang Province. It will become one of the receiving terminals with the largest capacity and most complete functions in China. 

    It is expected in operation in 2018.


    City:Jiaxing

    Haining Nanbei Avenue/Jianshan New District Sub-High Pressure Natural Gas Pipeline 
     

    Pipe Diameter: DN350

    Length: 25Km

    Design Pressure: 0.8MPa

    Jiangxi
    Hunan
    Zhuzhou Xiangtan Huaihua Changsha
    City:Zhuzhou

    Zhuzhou project department telephone: +86-731-28835328

    City:Xiangtan

    Xiangtan project department telephone:+86-731-52255151

    City:Huaihua

    Huaihua project department telephone: +86-745-2655253

    City:Changsha

    Xingsha Storage & Distribution General Contracting Project for Hunan ENN Changsha Natural Gas Utilization Engineering 

    Treatment capacity:200,000 Nm3/d 


    Fujian
    Quanzhou Hui’an Nan’an
    City:Quanzhou

    Quanzhou project department telephone: +86-595-22003085

    City:Hui’an

    Hui’an project department telephone: +86-595-87800330

    City:Nan’an

    Nan’an project department telephone: +86-595-86921157

    Guangdong
    Maoming Dongguan Zhaoqing Huadu
    City:Maoming

    Sinopec Maoming Branch High Sulfur Coking Coal CFB Boiler Attaching with FGD Unit Project 

    City:Dongguan

    Dongguan High Pressure Pipeline
     

    Pipe Diameter: DN610

    Length: 210Km

    Design Pressure: 4.4MPa


    City:Zhaoqing

    Zhaoqing project department telephone: +86-758-2799860

    City:Huadu

    Huadu project department telephone: +86-20-29892772

    Guangxi
    Guilin Beibuwan
    City:Guilin

    Guilin project department telephone: +86-773-3559369

    City:Beibuwan

    Beihai ENN Weizhou Island LNG Project

    Treatment capacity: 250,000 Nm3/d 


    Yunnan
    Qujing
    City:Qujing

    Qujing Yuntou COG to LNG Project
     

    Project Capacity: 184 Million Nm3/a

    Contracting type: EPC


    Sichuan
    About Us
    Profile Culture Organization Responsibility
    Technology Innovation
    Natural Gas Purification Natural Gas Cryogenic Liquefaction Natural Gas Utilization Design Coal-Based Clean Energy Utilization LNG Receiving Terminal Energy-Saving & Environment Protection Equipment Integration Technology
    Capacity & References
    Qualifications Capacity Typical Cases Project List
    Contact Us
    Xindi Energy Engineering Technology Co., Ltd.
    Block B, South District, Technology Park, No.118 Huaxiang Road, Langfang Development Zone, Langfang, Hebei Province
    Fax:+86-316-2591234

    Xindi Energy Engineering